Telecommunication systems: general assessment: infrastructure projects are underway, including the national plan to deliver fiber-based service of at least 150Mb/s nationally by the end of 2022; operators invested in fiber-based networks to deliver a 1Gb/s service to most premises, and on 5G to cover more than half of population; operator test of satellite broadband; Dublin is smart city (2021) (2020)
domestic: increasing levels of broadband access particularly in urban areas; fixed-line 36 per 100 and mobile-cellular 105 per 100 subscriptions; digital system using cable and microwave radio relay (2019)
international: country code - 353; landing point for the AEConnect -1, Celtic-Norse, Havfrue/AEC-2, GTT Express, Celtic, ESAT-1, IFC-1, Solas, Pan European Crossing, ESAT-2, CeltixConnect -1 & 2, GTT Atlantic, Sirius South, Emerald Bridge Fibres and Geo Eirgrid submarine cable with links to the US, Canada, Norway, Isle of Man and UK; satellite earth stations - 81 (2019)
note: the COVID-19 pandemic continues to have a significant impact on production and supply chains globally; since 2020, some aspects of the telecom sector have experienced downturn, particularly in mobile device production; many network operators delayed upgrades to infrastructure; progress towards 5G implementation was postponed or slowed in some countries; consumer spending on telecom services and devices was affected by large-scale job losses and the consequent restriction on disposable incomes; the crucial nature of telecom services as a tool for work and school from home became evident, and received some support from governments
Definition: This entry includes a brief general assessment of a country's telecommunications system with details on the domestic and international components. The following terms and abbreviations are used throughout the entry:
Source: CIA World Factbook - This page was last updated on Saturday, September 18, 2021