Home

Armenia vs. Azerbaijan

Transportation

ArmeniaAzerbaijan
Railwaystotal: 780 km (2014)

broad gauge: 780 km 1.520-m gauge (780 km electrified) (2014)

note: 726 km operational
total: 2,944 km (2017)

broad gauge: 2,944.3 km 1.520-m gauge (approx. 1,767 km electrified) (2017)
Roadwaystotal: 7,700 km (2019)

urban: 3,780 km

non-urban: 3,920 km
total: 24,981 km (2013)
Pipelines3838 km gas (high and medium pressure) (2017)89 km condensate, 3890 km gas, 2446 km oil (2013)
Airportstotal: 7 (2020)total: 23 (2020)
Airports - with paved runwaystotal: 10 (2017)

over 3,047 m: 2 (2017)

2,438 to 3,047 m: 2 (2017)

1,524 to 2,437 m: 4 (2017)

914 to 1,523 m: 2 (2017)
total: 30 (2017)

over 3,047 m: 5 (2017)

2,438 to 3,047 m: 5 (2017)

1,524 to 2,437 m: 13 (2017)

914 to 1,523 m: 4 (2017)

under 914 m: 3 (2017)
Airports - with unpaved runwaystotal: 1 (2013)

914 to 1,523 m: 1 (2013)
total: 7 (2013)

under 914 m: 7 (2013)
National air transport systemnumber of registered air carriers: 3 (2020)

inventory of registered aircraft operated by air carriers: 5
number of registered air carriers: 42 (2020)

inventory of registered aircraft operated by air carriers: 44

annual passenger traffic on registered air carriers: 2,279,546 (2018)

annual freight traffic on registered air carriers: 44.09 million mt-km (2018)
Civil aircraft registration country code prefixEK4K

Source: CIA Factbook