paved: 14,420 km (8,500 km highways, 1,872 urban roads, and 4,048 rural roads) (2017)
unpaved: 147,032 km (2017)
Waterways
(there are no long navigable stretches of river in Uganda; parts of the Albert Nile that flow out of Lake Albert in the northwestern part of the country are navigable; several lakes including Lake Victoria and Lake Kyoga have substantial traffic; Lake Albert is navigable along a 200-km stretch from its northern tip to its southern shores) (2011)
none specifically; the only significant inland waterway is the part of Lake Victoria within the boundaries of Kenya; Kisumu is the main port and has ferry connections to Uganda and Tanzania (2011)
Ports and terminals
lake port(s): Entebbe, Jinja, Port Bell (Lake Victoria)
major seaport(s): Kisumu, Mombasa
LNG terminal(s) (import): Mombasa
Merchant marine
total: 1
by type: bulk carrier 1 (2019)
total: 24
by type: oil tanker 2, other 22 (2020)
Airports
total: 47 (2013)
total: 197 (2013)
Airports - with paved runways
total: 5 (2019)
over 3,047 m: 3
1,524 to 2,437 m: 1
914 to 1,523 m: 1
total: 16 (2017)
over 3,047 m: 5 (2017)
2,438 to 3,047 m: 2 (2017)
1,524 to 2,437 m: 2 (2017)
914 to 1,523 m: 6 (2017)
under 914 m: 1 (2017)
Airports - with unpaved runways
total: 42 (2013)
over 3,047 m: 1 (2013)
1,524 to 2,437 m: 8 (2013)
914 to 1,523 m: 26 (2013)
under 914 m: 7 (2013)
total: 181 (2013)
1,524 to 2,437 m: 14 (2013)
914 to 1,523 m: 107 (2013)
under 914 m: 60 (2013)
National air transport system
number of registered air carriers: 6 (2020)
inventory of registered aircraft operated by air carriers: 26
annual passenger traffic on registered air carriers: 21,537 (2018)
number of registered air carriers: 25 (2020)
inventory of registered aircraft operated by air carriers: 188
annual passenger traffic on registered air carriers: 5,935,831 (2018)
annual freight traffic on registered air carriers: 294.97 million mt-km (2018)