Time required to build a warehouse (days) in Arab World was 125.44 as of 2019. Its highest value over the past 14 years was 157.50 in 2005, while its lowest value was 125.44 in 2019.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 157.50
2006 157.39
2007 152.75
2008 152.10
2009 144.58
2010 144.38
2011 141.08
2012 144.73
2013 147.87
2014 145.87
2015 147.37
2016 137.06
2017 136.94
2018 136.42