Bangladesh - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Bangladesh was 273.52 as of 2019. Its highest value over the past 6 years was 273.52 in 2019, while its lowest value was 272.74 in 2013.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2013 272.74
2014 272.74
2015 272.74
2016 272.74
2017 273.52
2018 273.52
2019 273.52