Time required to build a warehouse (days)

Time required to build a warehouse (days) in Belgium was 212.00 as of 2019. Its highest value over the past 14 years was 212.00 in 2019, while its lowest value was 212.00 in 2005.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 212.00
2006 212.00
2007 212.00
2008 212.00
2009 212.00
2010 212.00
2011 212.00
2012 212.00
2013 212.00
2014 212.00
2015 212.00
2016 212.00
2017 212.00
2018 212.00
2019 212.00