Bhutan - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Bhutan was 150.00 as of 2019. Its highest value over the past 14 years was 151.00 in 2015, while its lowest value was 150.00 in 2016.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 151.00
2006 151.00
2007 151.00
2008 151.00
2009 151.00
2010 151.00
2011 151.00
2012 151.00
2013 151.00
2014 151.00
2015 151.00
2016 150.00
2017 150.00
2018 150.00
2019 150.00