Eswatini - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Eswatini was 116.00 as of 2019. Its highest value over the past 14 years was 116.00 in 2019, while its lowest value was 116.00 in 2005.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 116.00
2006 116.00
2007 116.00
2008 116.00
2009 116.00
2010 116.00
2011 116.00
2012 116.00
2013 116.00
2014 116.00
2015 116.00
2016 116.00
2017 116.00
2018 116.00
2019 116.00