Euro area - Time required to build a warehouse
Time required to build a warehouse (days)
Time required to build a warehouse (days) in Euro area was 189.32 as of 2019. Its highest value over the past 14 years was 225.19 in 2008, while its lowest value was 187.68 in 2017.
Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.
Source: World Bank, Doing Business project (http://www.doingbusiness.org/).