Grenada - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Grenada was 146.00 as of 2019. Its highest value over the past 14 years was 146.00 in 2019, while its lowest value was 146.00 in 2005.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 146.00
2006 146.00
2007 146.00
2008 146.00
2009 146.00
2010 146.00
2011 146.00
2012 146.00
2013 146.00
2014 146.00
2015 146.00
2016 146.00
2017 146.00
2018 146.00
2019 146.00

Classification

Topic: Private Sector & Trade Indicators

Sub-Topic: Business environment