India - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in India was 106.22 as of 2019. Its highest value over the past 6 years was 183.72 in 2016, while its lowest value was 106.22 in 2019.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2013 183.72
2014 183.72
2015 183.72
2016 183.72
2017 143.87
2018 108.01
2019 106.22

Classification

Topic: Private Sector & Trade Indicators