Time required to build a warehouse (days) in Jordan was 66.00 as of 2019. Its highest value over the past 14 years was 95.00 in 2008, while its lowest value was 66.00 in 2013.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 95.00
2006 95.00
2007 95.00
2008 95.00
2009 67.00
2010 67.00
2011 67.00
2012 67.00
2013 66.00
2014 66.00
2015 66.00
2016 66.00
2017 66.00
2018 66.00
2019 66.00