Lao PDR - Time required to build a warehouse
Time required to build a warehouse (days)
Time required to build a warehouse (days) in Lao PDR was 92.00 as of 2019. Its highest value over the past 14 years was 98.00 in 2005, while its lowest value was 83.00 in 2006.
Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.
Source: World Bank, Doing Business project (http://www.doingbusiness.org/).