Luxembourg - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Luxembourg was 155.00 as of 2019. Its highest value over the past 13 years was 155.00 in 2019, while its lowest value was 153.00 in 2006.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2006 153.00
2007 153.00
2008 153.00
2009 153.00
2010 153.00
2011 155.00
2012 155.00
2013 155.00
2014 155.00
2015 155.00
2016 155.00
2017 155.00
2018 155.00
2019 155.00