Time required to build a warehouse (days)

Time required to build a warehouse (days) in Maldives was 140.00 as of 2019. Its highest value over the past 14 years was 140.00 in 2019, while its lowest value was 140.00 in 2005.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 140.00
2006 140.00
2007 140.00
2008 140.00
2009 140.00
2010 140.00
2011 140.00
2012 140.00
2013 140.00
2014 140.00
2015 140.00
2016 140.00
2017 140.00
2018 140.00
2019 140.00