Montenegro - Rail lines

Rail lines (total route-km)

The value for Rail lines (total route-km) in Montenegro was 249.00 as of 2018. As the graph below shows, over the past 15 years this indicator reached a maximum value of 249.00 in 2018 and a minimum value of 239.20 in 2011.

Definition: Rail lines are the length of railway route available for train service, irrespective of the number of parallel tracks.

Source: Internation Union of Railways (UIC)

See also:

Year Value
2003 249.00
2004 249.00
2005 248.00
2006 248.00
2007 249.00
2008 249.00
2009 249.00
2010 249.00
2011 239.20
2012 239.20
2013 249.00
2014 249.00
2015 249.00
2016 249.00
2017 249.00
2018 249.00

Classification

Topic: Infrastructure Indicators

Sub-Topic: Transportation