Montenegro - Rail lines
Rail lines (total route-km)
The value for Rail lines (total route-km) in Montenegro was 249.00 as of 2018. As the graph below shows, over the past 15 years this indicator reached a maximum value of 249.00 in 2018 and a minimum value of 239.20 in 2011.
Definition: Rail lines are the length of railway route available for train service, irrespective of the number of parallel tracks.
Source: Internation Union of Railways (UIC)
See also:
Year | Value |
---|---|
2003 | 249.00 |
2004 | 249.00 |
2005 | 248.00 |
2006 | 248.00 |
2007 | 249.00 |
2008 | 249.00 |
2009 | 249.00 |
2010 | 249.00 |
2011 | 239.20 |
2012 | 239.20 |
2013 | 249.00 |
2014 | 249.00 |
2015 | 249.00 |
2016 | 249.00 |
2017 | 249.00 |
2018 | 249.00 |
Classification
Topic: Infrastructure Indicators
Sub-Topic: Transportation