Time required to build a warehouse (days)

Time required to build a warehouse (days) in North America was 164.80 as of 2019. Its highest value over the past 14 years was 249.00 in 2012, while its lowest value was 164.80 in 2013.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).