North Macedonia - Rail lines
Rail lines (total route-km)
The value for Rail lines (total route-km) in North Macedonia was 683.00 as of 2019. As the graph below shows, over the past 24 years this indicator reached a maximum value of 699.00 in 2014 and a minimum value of 683.00 in 2015.
Definition: Rail lines are the length of railway route available for train service, irrespective of the number of parallel tracks.
Source: Internation Union of Railways (UIC)
See also:
Year | Value |
---|---|
1995 | 699.00 |
1996 | 699.00 |
1997 | 699.00 |
1998 | 699.00 |
1999 | 699.00 |
2000 | 699.00 |
2001 | 699.00 |
2002 | 699.00 |
2003 | 699.00 |
2004 | 699.00 |
2005 | 699.00 |
2006 | 699.00 |
2007 | 699.00 |
2008 | 699.00 |
2009 | 699.00 |
2010 | 699.00 |
2011 | 699.00 |
2012 | 699.00 |
2013 | 699.00 |
2014 | 699.00 |
2015 | 683.00 |
2016 | 683.00 |
2017 | 683.00 |
2018 | 683.00 |
2019 | 683.00 |
Classification
Topic: Infrastructure Indicators
Sub-Topic: Transportation