Poland - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Poland was 137.00 as of 2019. Its highest value over the past 14 years was 282.00 in 2006, while its lowest value was 137.00 in 2016.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 282.00
2006 282.00
2007 268.00
2008 268.00
2009 268.00
2010 268.00
2011 153.00
2012 138.00
2013 140.00
2014 138.00
2015 138.00
2016 137.00
2017 137.00
2018 137.00
2019 137.00