Time required to build a warehouse (days) in Senegal was 177.00 as of 2019. Its highest value over the past 14 years was 267.00 in 2013, while its lowest value was 177.00 in 2015.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 252.00
2006 252.00
2007 252.00
2008 252.00
2009 252.00
2010 267.00
2011 267.00
2012 267.00
2013 267.00
2014 222.00
2015 177.00
2016 177.00
2017 177.00
2018 177.00
2019 177.00