South Asia - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in South Asia was 149.70 as of 2019. Its highest value over the past 14 years was 209.25 in 2013, while its lowest value was 149.70 in 2019.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 195.00
2006 195.00
2007 195.00
2008 195.00
2009 193.20
2010 189.00
2011 189.00
2012 188.80
2013 209.25
2014 185.87
2015 179.25
2016 183.00
2017 178.11
2018 169.96
2019 149.70