Switzerland - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Switzerland was 156.00 as of 2019. Its highest value over the past 14 years was 156.00 in 2019, while its lowest value was 156.00 in 2005.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).