Zambia - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Zambia was 188.00 as of 2019. Its highest value over the past 14 years was 230.00 in 2006, while its lowest value was 188.00 in 2012.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 230.00
2006 230.00
2007 207.00
2008 207.00
2009 207.00
2010 207.00
2011 208.00
2012 188.00
2013 188.00
2014 188.00
2015 188.00
2016 188.00
2017 188.00
2018 188.00
2019 188.00