Commodity | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 |
Electrical signalling/safety/traffic control equip. for railways/tramways | $3,209,597 | $4,818,694 | $3,348,956 | $291,980 | $250,200 | $1,266,301 | $4,095,011 |
Electrical signalling/safety/traffic control equip. other than for railways ... | $401,923 | $570,233 | $226,807 | $520,881 | $3,841,638 | $628,738 | $2,599,482 |
Parts of the electrical signalling/safety/traffic control equip. of 85.30 | $3,735,454 | $2,149,189 | $1,213,547 | $272,893 | $799,996 | $896,226 | $2,279,875 |
Total | $7,346,974 | $7,538,116 | $4,789,310 | $1,085,754 | $4,891,834 | $2,791,265 | $8,974,368 |
|
|