Commodity | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 |
Railway/tramway track fixtures & fittings; mech...signalling, safety/traffi ... | $280,595 | $44,439 | $88,082 | $128,371 | $284,674 | $660,453 | $1,343,647 |
Total | $280,595 | $44,439 | $88,082 | $128,371 | $284,674 | $660,453 | $1,343,647 |
|
|